Cheyne Court
Chelsea, LondonA full refurbishment of an apartment within a listed building required extensive room and overall layout remodelling.
Challenges included strict constraints around drilling floors and ceilings. Access due to being on the fourth floor and additional fire safety considerations to accommodate significant floor plan changes.
Services
Architectural Design
Project management
Bespoke joinery
Type of work
Upper floor apartment
Full refurbishment
Interior refit/remodelling
Challenge
The construction site was actually located on the fourth floor of the apartment block. Access was further limited as stairwells and other communal accessways were in constant use.
Solution
Electric hoists and the necessary permits to operate were set up to ensure materials could be lifted from the outside and brought in through existing windows.
Challenge
Due to the location remodelling and the amount of original artwork on display, the client requested a solution that would help to showcase both the architectural features at the same time and ensure no long-term fading/damage to the artwork.
Solution
Bespoke specialist lighting was sourced and incorporated throughout. Special care was taken to ensure choices were sympathetic to the location, style and purpose.