A full refurbishment of an apartment within a listed building required extensive room and overall layout remodelling.

Challenges included strict constraints around drilling floors and ceilings. Access due to being on the fourth floor and additional fire safety considerations to accommodate significant floor plan changes.

Services

Architectural Design
Project management
Bespoke joinery

Type of work

Upper floor apartment
Full refurbishment
Interior refit/remodelling

Pic showing the outside and surrounding location of Cheyne Court
Pic showing the original apartment floor plan
Pic showing the proposed updated floor plan
Pic showing steels going in and supports around
Series of pics showing wall structure being attached to steels

Challenge

Due to the listed status, constraints included no drilled fixings to be used on either floors or ceilings.

Solution

All new walls were suspended (floating) from the steel supports.

Pic showing the one of the areas that required fire curtains
Series of pics showing where the hidden fire curtain was located

Challenge

Due to the change in room layouts, bedrooms and living areas crossed the kitchen. This meant that there was no alternative fire escape.

Solution

A fire alarm system was installed which controlled fire curtains hidden in the quartz cladding of the pillars.

Challenge

The construction site was actually located on the fourth floor of the apartment block. Access was further limited as stairwells and other communal accessways were in constant use.

Solution

Electric hoists and the necessary permits to operate were set up to ensure materials could be lifted from the outside and brought in through existing windows.

Pic showing the upper floor height from a balcony

Challenge

Due to the location remodelling and the amount of original artwork on display, the client requested a solution that would help to showcase both the architectural features at the same time and ensure no long-term fading/damage to the artwork.

Solution

Bespoke specialist lighting was sourced and incorporated throughout. Special care was taken to ensure choices were sympathetic to the location, style and purpose.

Series of pics showing the bespoke lighting in the hall way and the living room
Series of pics showing the bespoke lighting in the living room and a bedroom
Pic showing the living room before the construction work Pic showing the living room after construction work
Pic showing the pre opened out living area Pic showing the dining area in the remodelled living room
Pic showing the entrance hall before construction work Pic showing the entrance hall after construction work
Pic showing the view from the kitchen towards living room before construction work Pic showing view from kitchen towards living room after construction
Pic showing the bathroom before remodelling Pic showing bathroom after remodelling
Pic showing the master bedroom before construction work Pic showing master bedroom after construction work
Pic showing the north bedroom before construction work Pic showing north bedroom after construction work
Pic showing the south bedroom before construction work Pic showing the south bedroom after construction work